New electricity connection, and changing the name on the bill
You learn how to get a new electricity connection for a home or a shop, and how to change the name on the bill after buying a house or after a death in the family: the documents, the charges and the time limits.
For whom: Anyone in Telangana who needs a new electricity meter for a home or a shop, or needs an existing connection moved into their name. For farm and industrial connections this guide only points the way.
Tell us your situation first; then the documents and steps open.
1Your situation
A few questions. We show only the documents and steps your answers need.
- What do you need?
- What is the connection for?
- Why does the name need to change?
- Which district is the property in? (The power company depends on the district; its name is also on the bill)
Your answers stay on this phone.
Each step below says who it is for. Confirm yours at the office, then change your answer here.
Another route for you
A farm connection needs more documents: a pattadar pass book or patta in TGSPDCL's area, a village assistant's certificate in TGNPDCL's. TGNPDCL publishes a seniority list for farm connections. This guide covers home and shop connections only.
→ Ask about a farm connection at your area's section office (AE, Operation) or Customer Service Centre.
Another route for you
Electricity connections for industries go through TG-iPASS (the industries' single window). A high tension (HT) connection has its own application and needs CEIG approval before supply. This guide covers home and shop connections only.
→ See the TG-iPASS website (ipass.telangana.gov.in), or ask at your power company's division or circle office.
2Documents you need
Tick the ones you have. They are kept in this browser.
Nothing to get ready before these steps.
3Your steps
· Do them in order. Tick each one when it is done.
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
Before you apply, check: the house wiring is complete (the company advises good wire and MCBs), there is an earth pit, the meter board is outside or in the veranda at least 5 feet above the ground, and the service pipe runs visibly on the wall.
There must be no electricity dues on the premises or in your name anywhere. Buildings of 15 metres and taller need CEIG approval.
Sources: 8
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
On the TGSPDCL website open the "LT New Service" application and register with the OTP sent to your mobile.
Upload the documents and pay the fee online or by DD. You get an acknowledgement and an SMS; keep the application number. If you cannot apply online, you can apply at the nearest section office or Customer Service Centre.
Open the official pageNot confirmed: The regulation does not say clearly whether the ₹600 (₹1,200 for a shop) between 1 and 5 kW is for each kW of the whole load or only for the load above 1 kW. The amount for your load is shown when you register; if in doubt, ask at the section office.
Sources: 1, 4, 5, 7, 2, 3, 20
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
An officer checks your documents and the AE (Operation) visits the premises.
If a document is not right, you get an SMS with the reason and a link to upload it again; upload the right document with that link. You can follow the application under "My Application Status".
Open the official pageSources: 7, 1
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
For a connection by overhead line within 1 km of the existing network, the new line work is covered by the fixed service line charges paid with the application, and the company provides the transformer free; there is no separate estimate.
Only if new poles or a line are needed beyond 1 km is an estimate prepared and sanctioned. If you are asked to pay it, pay under "Payment against estimation" on the TGSPDCL website or by DD, and keep the receipt.
Open the official pageSources: 7, 1, 4, 3, 2, 20
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
The staff fix the meter and give supply.
Sign the test report. Ask for a receipt for every payment; the company itself says not to go through middlemen or brokers.
Sources: 7, 8, 3, 2
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem, Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Komaram Bheem Asifabad, Jagtial, Rajanna Sircilla (TGNPDCL)
First have the house wiring completed by a licensed electrical contractor.
TGNPDCL's application form asks for the contractor's name, licence number and address, whether the service pipe is visible outside, and which appliances of how many watts (the load); have these details ready.
Sources: 15
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem, Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Komaram Bheem Asifabad, Jagtial, Rajanna Sircilla (TGNPDCL)
Apply for a new connection at the nearest MeeSeva centre, or online through "New Service Connection" on the TGNPDCL website.
Hand in the documents, pay the charges and keep the receipt.
Open the official pageNot confirmed: TGNPDCL's charges table carries no date (it bears the company's old name, TSNPDCL) and does not give the MeeSeva service charge; TGNPDCL's pages do not yet show the new service line charges. The regulation does not say clearly whether the per-kW rate between 1 and 5 kW is for the whole load or only the load above 1 kW. Ask at MeeSeva and get a receipt for every amount.
Sources: 12, 16, 13, 11, 3, 20
- Do this nowIf: A new electricity connection (a new meter)If: A home / A shop, office or other businessIf: Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem, Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Komaram Bheem Asifabad, Jagtial, Rajanna Sircilla (TGNPDCL)
Within 1 km of the existing network, the new line work is covered by the fixed service line charges paid with the application, and the company provides the transformer free.
If new poles or a line are needed beyond 1 km, pay the estimate you are given. Then the staff fix the meter and give supply. You can follow the application under "Know Your Application Status" on the TGNPDCL website.
Sources: 11, 3, 20
- Do this nowIf: A change of name on an existing connection and its billIf: I bought the house, or it was given to me (gift deed)If: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
When a house changes hands, TGSPDCL says the present holder of the connection (the seller) should ask the ICSC in writing for a "special reading" at least 15 days ahead.
Sources: 8
- Do this nowIf: A change of name on an existing connection and its billIf: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy, Medak, Siddipet, Yadadri Bhuvanagiri, Nalgonda, Suryapet, Mahabubnagar, Narayanpet, Nagarkurnool, Wanaparthy, Jogulamba Gadwal (TGSPDCL)
On the TGSPDCL website open "Consumer Service Request" and choose title transfer (name change).
Enter the service number, upload the documents and pay the fee. You can pay online, by DD, at the ERO counter, or with the QR code at a Customer Service Centre.
Open the official pageSources: 1, 9, 2, 3
- Do this nowIf: A change of name on an existing connection and its billIf: Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem, Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Komaram Bheem Asifabad, Jagtial, Rajanna Sircilla (TGNPDCL)
Apply for the title transfer (name change) of the connection at a MeeSeva centre.
The new owner signs a fresh agreement and test report; the old and new owners both sign a declaration on stamp paper. There must be no dues on the connection and no theft or other case pending on it.
Not confirmed: TGNPDCL's pages do not give the name change fee, or say what replaces the old owner's signature when the owner has died. Ask at the MeeSeva centre or the section office.
Sources: 14, 13, 3
If something goes wrong
If it is rejected
If the application is rejected, ask for the reason (TGSPDCL sends it by SMS with a link to upload again). If that does not settle it, complain to your area's ADE (Operation), then the DE (Operation). If it is still not settled, go to your company's CGRF (Consumer Grievance Redressal Forum); new connections and name changes are within its scope.
Your area's ADE / DE (Operation), then the CGRF
If it is late
If the time limit passes, call 1912 (24 hours, free), register a complaint and note its number; then go to the ADE and DE (Operation). The regulation sets ₹200 compensation for each day of delay; you can claim it at the CGRF. In TGNPDCL's area 18004250028 also works.
Electricity complaints number 1912
Also
TGSPDCL's area: you can complain to the CGRF online, in person, by post or by e-mail; you must get an acknowledgement. Complain within two years of the problem. On complaints such as a new connection or a name change, the order is due within 45 days (15 days for no supply or disconnection).
TGSPDCL CGRF (Consumer Grievance Redressal Forum) · Open the official page
Also
TGNPDCL's area: CGRF Warangal (Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem), phone 0870-2461551; CGRF Nizamabad (Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Asifabad, Jagtial, Sircilla), phone 08462-295942. There is also an online complaint form on the TGNPDCL website. The time limits are those above.
TGNPDCL CGRF (Warangal / Nizamabad) · Open the official page
Also
If you are not satisfied with the CGRF's order, or no order comes in time, you can appeal to the Vidyut Ombudsman of Telangana within 45 days of receiving the order. If the CGRF assessed an amount you must pay, one third of it is deposited first. The Ombudsman's order is due within 60 days. The office is on the first floor of the 33/11 kV substation beside the Hyderabad Boat Club, near Lumbini Park, Hyderabad 500004; phone 8500827424.
Vidyut Ombudsman, Telangana · Open the official page
If you are asked for more money
TGSPDCL says not to go to middlemen or brokers, and to insist on a receipt for every payment and an acknowledgement for every application. If you are asked for more than the charges above, ask for a receipt and complain on 1912.
Electricity complaints number 1912
The 21 official pages and papers this guide is written from
- TGSPDCL website: Consumer Services, FAQs and CGRF
- TGSPDCL Citizen's Charter: Standards of Performance
- Schedule II, Regulation No.5 of 2016: Guaranteed Standards of Performance and Compensation to Consumers in Case of Default
- Documents and Connection Charges for New Services
- Documents to be furnished for New Service Registration (Download Forms)
- Circular Memo No. CGM(C)/SE(C)/DE(C)/ADE-V/EODB/D.No.226318, dt. 3-12-2018: documents for new electricity connections reduced
- New Service Connection (NRS): Process Flowchart
- Advice / Guidelines & Caution to Consumers
- Documents Required for Title Transfer with Fees (December 2022)
- General Terms & Conditions of Supply (as amended up to 26.10.2016, adopted by TSERC by Regulation 1 of 2014): Grievance Redressal
- TGNPDCL website: home page
- TGNPDCL: Service Request, New Connection
- TGNPDCL: NPDCL Services at MeeSeva Centers
- TGNPDCL: Service Request, Name Change
- Application for Supply of Electricity at Low Tension (LT New Connection Form)
- Load wise category wise charges (including GST) (linked from the TGNPDCL website as "Category & Load Wise Charges")
- Forum for Redressal of Consumer Grievances: Complete Address and Contacts
- TGERC (Establishment of Mechanism for Redressal of Grievances of Consumers) Regulation, 2026 (Regulation No. 06 of 2026)
- Vidyut Ombudsman, Telangana: website, Contact
- TGERC (Licensee's Duty for Supply of Electricity on Request) Second Amendment Regulation, 2026 (Regulation No. 01 of 2026), Telangana Gazette Extraordinary, Part II, No. 50
- Download Forms